TECHNICAL DEMANDS MEC YEK

full range p.a. system (Nexo, Martin, EAW,...)
0 - 500 persons 2 x 2 k
500 - 1000 persons 2 x 4 kW
> 1000 persons contact band
32-8-2 mixing table (Soundcraft, Midas,...)
4-bands parametric eq.
4 aux sends phantom power (48 volt
outboard
2 x 31-bands graphic eq.
3 x compressor limiter
4 x noise gate
2 x reverb type lexicon/yamaha spx
1 x delay type tc 2290
monitor
24-5 Monitor mixing table
4-bands parametric eq.
31-bands graphic eq. on all outputs
min. 5x 15" floormonitors on min. 3 sends

INSTR MIC/DI REMARKS
1 bass clarinet RE 20  
2 clarinet MD421, SM 57 no condensator
3 sax soprano MD421, SM 57
4 accordeon R (High) XLR (element < band)  
5 accordeon L (Low) XLR (element < band)  
6 contrabas DI phantom + compressor 1
7 contrabas MD421  
8 lead voc SM 58 compressor 2
9 lead voc DISM 58 compressor 3
10 lead voc SM 57A / SM 58 compressor 4
11 backing voc SM58  


remarks


1.intercom FOH - stage is necessary
2.the FOH mixing table may not be placed: a) on or under a balcony; b) left / right of the central axe of the stage
3.all mentioned items may be replaced by other, on the condition that the quality is the same or comparable
4.if you have questions, please contact the band
5.if the p.a. is rented, the renting company has to be informed of the technical demands here formulated